La reproduction, même partielle, de toute image ou photo présentes sur ce site est interdite sans accord préalable.

Noisy-le-Grand Banks of the Marne

FMp_berges-de-marne_01

The project for the banks near Noisy offers an ecological development, habitat for leisure activities and soft transport. It is about guaranteeing peaceful access to their homes for the people who live there while creating a continuous cycle path, reconfiguring the ecological banks by generating biodiversity, and creating leisure spaces on the slopes (beaches, riverside walks, fishing pontoons, observation points, docking ramps, etc.).

 

PROJECT MANAGEMENT
Competition winner 2011 / Studies in progress

Contracting authority
Noisy-le-Grand town council
Project manager
Florence Mercier Paysagiste mandated landscape architect, Silène Biotec plant engineering, Ingénierie Tugec roads and utilities, COSIL lighting design
Budget
€8.7m
Surface area
Length: 1.25km